Small 6 square feet HO Scale Dolton Industry Park industrial switching model railroad layout, designed for operation in a small space.

Layout Snapshot

  • Type: Switching / Industrial Layout
  • Scale: HO
  • Layout Shape: 6 x 1 feet shelf when initially built in 2011. A few feet was added on as staging later in the same year
  • Motive power: All diesel, GPs, SWs, GE70s / GE 44s.
  • Rollingstock: 40 to 60 scale feet in length.
  • Control System: ROCO LokMaus 2 DCC, although most turnouts are Peco Insulfrog turnouts which means DC can be used on the layout and have locos isolated from track power.
  • Setting: Located near Dolton Junction on the Indiana Harbor Belt (IHB) near Illinois / Indiana border, mid 1970s to mid 1980s.
  • Layout Construction: Pine frame, with Chipboard.
  • Amount of Track: Approximately 15 feet on the scenic section.
  • Scenery Construction: The layout has a flat baseboard with scratchbuilt or kitbashed buildings comprising most of the structures.
  • Building commenced: Mid 2011. Later in the year a small staging module was built adding an extra few feet to the length.

Operation

Operating the Dolton Industry Park layout is more or less like a switching puzzle.


Starting an operating session

Until September 2011, a train was staged on the longest spur, with the locomotive facing east. After September 2011 a small staging module was built which allowed a train to be staged west of the Dolton Industry park so an operating session could start with a train in the staging are or ready to depart from the park. Dolton Industry Park Transport (DIRT) trains do not require a caboose, but any other railroad that runs a train to the park may require a caboose depending on their operating rules. There is normally also an extra loco available to facilitate switching, which will be in the Flour Mill spur or the Flour Mill spur lead, or anywhere where there is available space for it.

Switching is what its all about

Switching, to me, is the most interesting part of model railroad operations. All the layouts I have built since 2004 have been designed for switching and Dolton Industry Park is no exception. If I am given a choice on a layout of running a mainline train or a local with lots of switching, I will invariably choose the local over the mainline train.

From start to finish, an operating session on the Dolton Industry Park is switching, switching and more switching. Basically, cars at industries are collected and put in an outgoing train, and cars in an incoming train are switched out to the various industry spots.
While it is usual to have one train on the layout at a time, I have tried having two trains (albeit 1 x 4 cars, and 1 x 3 cars long) on the layout at the same time. It gets pretty crowded and pretty intense with two trains but it can also be lots of fun trying to work out how to get cars into and out of two trains with even less available space to move cars around!


Virtual Interchanging adds randomness and lots more fun

Some years ago I found a Yahoo Group that did virtual interchanging of cars between members layout. The C&SFT layout hosted a lot of virtually interchanged traffic and when I was deciding on a track plan and modus operandi for the Dolton Industry Park I wanted the layout to work well with the virtual interchange idea. The location chosen, track plan, and industries mix were all influenced to quite a large degree by the virtual interchange idea. A large proportion (often as high as 75%, sometimes 100%) of the traffic to and from the park in an operating session is virtually interchanged car movements through the Virtual Interchange Group I am a member of. The application I use to manage traffic on the layout is called the MRICF.

Ending an operating session

When being operated without an extra staging module, once all the cars that need to be moved have been, and the outgoing train is made up with the trains loco on the western end of the train, the session then ends. The actual moving of the train into or out of the industry park is not modelled. But when there is a staging module connected the inbound and outbound trains are moved as part of the operating session.

Train Safety

There are no signals on DIRT trackage, and a Restrict Speed Rule 80 applies from the divergence point with the IHB. There is normally anywhere from one to three locos on the layout at a time, with two locos being the most common number. As the layout is such a confined space and is designed for single person operation it is rare for there to be two locos actually moving at the same time, but there have been a few instances where there have been multiple operators using the layout.

Environs

The railroad is representative of the area east of Dolton Junction, around Cottage Grove Ave, and would be accessible from the IHB mainline. Below is a map of the environs.